Blue Mesa Power Plant Monthly Plant Net Generation-kwH Timeseries Data
Values per Facilities, Instructions, Standards, and Techniques (FIST) Vol 1 - 2. Note: Data are reported at a monthly time step. Although values are dated as the first of each month, they represent the end of month value for that month (e.g. value dated April 1 is the April end of month total/sum). https://www.usbr.gov/power/data/fist_pub.html
Catalog Record Title
Blue Mesa Power Plant Hydropower Operations Monitoring Data from Power Operations and Maintenance Tracking System (POMTS)
Generation Effort
Power Operations and Maintenance Tracking
Location Name
Blue Mesa Power Plant
Type
Time series
Modeled/Observed
Observed
Start Date
Fri Sep 01 1967 00:00:00 GMT-0600 (Mountain Daylight Time)
End Date
Thu Jan 01 2026 00:00:00 GMT-0700 (Mountain Standard Time)
Parameter Name
Plant Net Generation
Parameter Group
Power Generation
Parameter Transformation
calculation
Time Step
monthly
Parameter Unit
kWh
Item Vertical Datum
Update Frequency
monthly
Last Update
Tuesday, February 10th, 2026