Catalog Item

Mt. Elbert Pump Generating Plant Monthly Plant Pumping Energy Used-kwH Timeseries Data

Values per Facilities, Instructions, Standards, and Techniques (FIST) Vol 1 - 2. Note: Data are reported at a monthly time step. Although values are dated as the first of each month, they represent the end of month value for that month (e.g. value dated April 1 is the April end of month total/sum). https://www.usbr.gov/power/data/fist_pub.html
Query Data
Generation Effort Power Operations and Maintenance Tracking
Type Time series
Modeled/Observed Item-observed-value
Start Date Mon Jun 01 1981 00:00:00 GMT-0600 (Mountain Daylight Time)
End Date Sat Apr 01 2023 00:00:00 GMT-0600 (Mountain Daylight Time)
Parameter Name Plant Pumping Energy Used
Parameter Group Power Generation
Parameter Transformation sum
Time Step monthly
Parameter Unit kWh
Item Vertical Datum
Update Frequency monthly
Last Update Wednesday, May 10th, 2023

Disclaimer

Data are provisional and subject to revision unless otherwise noted. Data users are cautioned to consider carefully the provisional nature of the information before using it.