Catalog Item

Carlsbad Irrigation District daily Water Allotment Feet per Acre daily Time Series Data

Daily time series for modeled water allotment for Carlsbad Irrigation District in feet of water per acre of land. Results were modeled using the Pecos River Operations Model (PROM) for the purpose of the Pecos River Basin Study. This study used data from five downscaled and bias-corrected Global Climate Models (GCMs) run through a Variable Infiltration Capacity (VIC) hydrological model. Outputs at key headwater and tributary gages were then used as inputs and run through a RiverWare operations model, PROM. There are ten runs for each GCM which includes: a baseline run, five alternate management strategy runs, and four water footprint runs.
Query Data
Generation Effort Pecos River Basin Study
Type Time series
Modeled/Observed Item-modeled-value
Start Date Fri Jan 01 2010 00:00:00 GMT-0700 (Mountain Standard Time)
End Date Thu Dec 31 2099 00:00:00 GMT-0700 (Mountain Standard Time)
Parameter Name Water Allotment
Parameter Group Farm Allocation
Parameter Transformation calculation
Time Step daily
Parameter Unit ft/acre
Item Vertical Datum
Update Frequency not planned
Last Update Wednesday, April 21st, 2021

Disclaimer

Data are modeled and are subject to the assumptions used in the modeling and the limitations of the model. Results may not be representative of the full range of future possibilities that could occur with different modeling assumptions.