Catalog Item
Pecos River near Acme Monthly Number of Days Dry Time Series Data
Monthly time series for modeled number of days Pecos River near Acme Gage is dry (<5cfs). Results were modeled using the Pecos River Operations Model (PROM) for the purpose of the Pecos River Basin Study. This study used data from five downscaled and bias-corrected Global Climate Models (GCMs) run through a Variable Infiltration Capacity (VIC) hydrological model. Outputs at key headwater and tributary gages were then used as inputs and run through a RiverWare operations model, PROM. There are ten runs for each GCM which includes: a baseline run, five alternate management strategy runs, and four water footprint runs.
Catalog Record Title
Pecos River near Acme Pecos River Operations Modeling Data from Pecos River Basin Study
Generation Effort
Pecos River Basin Study
Location Name
Pecos River near Acme
Type
Time series
Modeled/Observed
Modeled
Start Date
Fri Jan 01 2010 00:00:00 GMT-0700 (Mountain Standard Time)
End Date
Tue Dec 01 2099 00:00:00 GMT-0700 (Mountain Standard Time)
Parameter Name
Number of days dry
Parameter Group
Channel Flow
Parameter Transformation
sum
Time Step
monthly
Parameter Unit
count
Item Vertical Datum
Update Frequency
not planned
Last Update
Wednesday, May 5th, 2021
Disclaimer
Data are modeled and are subject to the assumptions used in the modeling and the limitations of the model. Results may not be representative of the full range of future possibilities that could occur with different modeling assumptions.

