Catalog Record

Rio Felix at Old Highway Bridge near Hagerman Pecos River Operations Modeling Data from Pecos River Basin Study

Time-series water operations data modeled by the Pecos River Operations Model (PROM) data for the Pecos River Basin Study as part of the Water SMART Program. This study used data from five downscaled and bias-corrected Global Climate Models (GCMs) run through a Variable Infiltration Capacity (VIC) hydrological model. Outputs at key headwater and tributary gages were then used as inputs and run through a RiverWare operations model, PROM. There are ten runs for each GCM which includes: a baseline run, five alternate management strategy runs, and four water footprint runs.
Generation Effort Pecos River Basin Study
Themes Water
Tags Water Modeling, Basin Study, Alternate Strategies, Future Projections
Reclamation Project
Reclamation Program Basin Study Program

Location Information

Location Description
Location Tags Rio Grande River Basin, Pecos Basin
Location Parent
State(s) New Mexico
Unified Region(s) Upper Colorado Basin
Timezone MT
Elevation 3,403 ft
Vertical Datum NGVD29
Coordinates (lat, long) See Location Details
Horizontal Datum WGS84