Catalog Item
Lake Sumner and Dam daily Additional Water needed at Sumner for ESA cfs daily Time Series Data
Daily time series for modeled additional releases needed at Sumner to be compliant with the Endangered Species Act (ESA). ESA requirements below Sumner include gage targets for the Taiban and Acme USGS gage, with targets varying depending on how dry the year is. Results were modeled using the Pecos River Operations Model (PROM) for the purpose of the Pecos River Basin Study. This study used data from five downscaled and bias-corrected Global Climate Models (GCMs) run through a Variable Infiltration Capacity (VIC) hydrological model. Outputs at key headwater and tributary gages were then used as inputs and run through a RiverWare operations model, PROM. There are ten runs for each GCM which includes: a baseline run, five alternate management strategy runs, and four water footprint runs.
Catalog Record Title
Lake Sumner and Dam Pecos River Operations Modeling Data from Pecos River Basin Study
Generation Effort
Pecos River Basin Study
Location Name
Lake Sumner and Dam
Type
Time series
Modeled/Observed
Modeled
Start Date
Fri Jan 01 2010 00:00:00 GMT-0700 (Mountain Standard Time)
End Date
Thu Dec 31 2099 00:00:00 GMT-0700 (Mountain Standard Time)
Parameter Name
Additional Water needed at Sumner for ESA
Parameter Group
Lake/Reservoir Outflow
Parameter Transformation
average
Time Step
daily
Parameter Unit
cfs
Item Vertical Datum
Update Frequency
not planned
Last Update
Wednesday, April 21st, 2021
Disclaimer
Data are modeled and are subject to the assumptions used in the modeling and the limitations of the model. Results may not be representative of the full range of future possibilities that could occur with different modeling assumptions.

