Catalog Item
Brantley Lake and Dam Monthly Estimated TX Settlement Release af Time Series Data
Monthly time series for modeled estimated release of water in af to Texas from Brantley Reservoir for the Pecos Settlement. Results were modeled using the Pecos River Operations Model (PROM) for the purpose of the Pecos River Basin Study. This study used data from five downscaled and bias-corrected Global Climate Models (GCMs) run through a Variable Infiltration Capacity (VIC) hydrological model. Outputs at key headwater and tributary gages were then used as inputs and run through a RiverWare operations model, PROM. There are ten runs for each GCM which includes: a baseline run, five alternate management strategy runs, and four water footprint runs.
Catalog Record Title
Brantley Lake and Dam Pecos River Operations Modeling Data from Pecos River Basin Study
Generation Effort
Pecos River Basin Study
Location Name
Brantley Reservoir and Dam
Type
Time series
Modeled/Observed
Modeled
Start Date
Fri Jan 01 2010 00:00:00 GMT-0700 (Mountain Standard Time)
End Date
Tue Dec 01 2099 00:00:00 GMT-0700 (Mountain Standard Time)
Parameter Name
Estimated TX Settlement Release
Parameter Group
Lake/Reservoir Outflow
Parameter Transformation
sum
Time Step
monthly
Parameter Unit
af
Item Vertical Datum
Update Frequency
not planned
Last Update
Thursday, January 18th, 2024
Disclaimer
Data are modeled and are subject to the assumptions used in the modeling and the limitations of the model. Results may not be representative of the full range of future possibilities that could occur with different modeling assumptions.

