S&T Project 8141 Final Report: Hoover Dam Powerplant Noise Control Research – Survey Results Post Controls Install

A complete noise survey was performed at the Hoover Dam powerplant in Boulder City, NV in July of 2016. The survey was performed only for the Arizona side of the facility. Based on this survey, a series of engineering controls to reduce noise levels was recommended. The suggested controls were then prioritized, and in a first phase, a subset of the controls was installed. The same controls were installed on both the Arizona and the Nevada wings. A summary of installed treatments and noise reduction results is shown in Appendix A.
Download File Opens in new window
Generation Effort S&T Project 8141: Hoover Powerplant Noise Study
Location Name Hoover Power Plant
Type Uploaded file(s)
File Type PDF
Publisher Bureau of Reclamation
Publication Date Monday, August 2nd, 2021
Update Frequency not planned
Last Update Tuesday, September 7th, 2021

Disclaimer

The findings and conclusions of this work are those of the author(s) and do not necessarily represent the views of the Bureau of Reclamation.