Catalog Item

Lake Powell Glen Canyon Dam and Powerplant hourly Vapor Pressure Deficit Time Series Data

Hourly calculation of the vapor pressure deficit in kPa using relative humidity and air temperature collected from a Collison Floating Evaporation Pan in Lake Powell for the S&T Project 8119: Collison Floating Evaporation Pan.
Query Data
Generation Effort S&T Project 8119: Collison Floating Evaporation Pan and Additional Collison Floating Evaporation Pan Studies
Type Time series
Modeled/Observed Observed
Start Date Wed May 01 2019 01:00:00 GMT-0600 (Mountain Daylight Time)
End Date Fri May 01 2020 00:00:00 GMT-0600 (Mountain Daylight Time)
Parameter Name Vapor Pressure Deficit
Parameter Group Weather Data
Parameter Transformation calculation
Time Step hourly
Parameter Unit kPA
Item Vertical Datum
Update Frequency unknown
Last Update Friday, October 15th, 2021

Disclaimer

The findings and conclusions of this work are those of the author(s) and do not necessarily represent the views of the Bureau of Reclamation.