S&T Project 19170 Final Report: Uplift Pressure and Flow through Open Offset Joints in Spillway Chutes

Hydraulic jacking has caused catastrophic spillway chute failures in recent years, including at Oroville Dam in 2017 and on the fifth drop structure of the St. Mary Canal on Reclamation’s Milk River Project (Montana) in 2020. Void development beneath spillways is a frequent issue on Reclamation projects and hydraulic jacking failure modes are commonly considered in Reclamation risk analysis studies. This project reanalyzed laboratory tests performed ca. 1976 and 2007 to develop improved predictive relationships for uplift pressure at sealed joints (no foundation drainage) with varying geometries. Uplift pressures were related to mean channel velocity, estimated boundary layer velocities, and the dimensionless ratio of gap width to joint offset height. New laboratory testing performed in 2021 led to a better understanding of the role of boundary layer velocity profiles in the generation of uplift pressure and developed the first experimentally validated relationships for predicting flow rates through open joints. These findings will aid spillway designers and risk assessment teams considering spillway slab anchors and foundation drainage systems. Also see https://data.usbr.gov/catalog/8049.
Download File Opens in new window
Generation Effort S&T Project 19170: Uplift Pressures at Spillway Joints
Type Uploaded file(s)
File Type PDF
Publisher Bureau of Reclamation
Publication Date Thursday, September 30th, 2021
Update Frequency not planned
Last Update Wednesday, September 25th, 2024

Disclaimer

The findings and conclusions of this work are those of the author(s) and do not necessarily represent the views of the Bureau of Reclamation.