Catalog Item

S&T Project 21084 Final Report: Dam Removal Cost Database and Drivers

We created planning-level cost estimating tools to assist with projects needing to consider the dam removal alternative: (1) new databases of case studies (Duda et al. 2023a; Tullos and Bountry 2023); (2) scoping questions to help determine if complexity cost drivers will be present; (3) machine learning based regression trees to estimate a potential cost range; and (4) a Computation Guide for Cost Estimating that can be used to inform discussions on potential dam removal cost items, quantities, and unit costs (Appendix A). Using the collected data and knowing some basic characteristics about the average annual flow and geographic location of the dam site, in addition to dam size, can improve the ability to use past case studies for planning-level cost estimating. By additionally incorporating scoping questions to assess likelihood of complexity cost drivers, the initial uncertainty of a cost estimate can be further reduced especially for small dams. Applying the Computation Guide for Cost Estimating requires more robust information but helps users reduce cost uncertainty. This step further refines the dam removal objective, removal approach (partial or full; phased or instantaneous), engineering design, construction means and methods, quantities, and unit costs, and results in a quantitative cost estimate.
Download File Opens in new window
Generation Effort S&T Project 21084: Cost Estimating Guidelines for Dam Decommissioning Alternative
Location Name United States
Type Uploaded file(s)
File Type PDF
Publisher Bureau of Reclamation
Publication Date Tuesday, October 31st, 2023
Update Frequency not planned
Last Update Thursday, November 30th, 2023

Disclaimer

The findings and conclusions of this work are those of the author(s) and do not necessarily represent the views of the Bureau of Reclamation.