Catalog Item
Adaptive Sediment Management Program Final Report for the Elwha River Restoration Project
This technical report documents final results from six years of an interagency, adaptive sediment management program for the removal of Elwha and Glines Canyon dams including: (1) physical changes to the reservoirs and downstream river channel resulting from dam removal, (2) effects of dam removal on downstream water quality (sediment loads) and flood stage, (3) dam removal and reservoir drawdown methods (Appendix A), (4) modeling accomplished to support the EIS and adaptive management program (Appendix B), (5) dam operational effects on downstream discharge prior to dam removal (Appendix C), and (6) a literature review on potential effects of dam removal on the City of Port Angeles Ranney Well (Appendix D).
Catalog Record Title
Elwha River Sediment and Sedimentation Data from Elwha Dam Removal
Generation Effort
Elwha Dam Removal
Location Name
Elwha River
Type
Uploaded file(s)
File Type
PDF
Publisher
Bureau of Reclamation
Publication Date
Thursday, February 1st, 2018
Update Frequency
not planned
Last Update
Wednesday, November 19th, 2025
Disclaimer
The Bureau of Reclamation assumes no responsibility or liability for any errors or omissions in the content of this data. The information contained in this data is provided on an "as is" basis with no guarantees of completeness, accuracy, usefulness or timeliness and without any warranties of any kind whatsoever, express or implied. The Bureau of Reclamation does not warrant that this data and any information or material downloaded from the data, will be uninterrupted, error-free, omission-free or free of virus or other harmful items.

