S&T Project 21076 Data: Canal Seepage, Construction Costs, Cost/Benefit Ratios
The canal seepage data prior to installing the concrete lining and the seepage data after the lining was installed were measured by Sunnyside Valley Irrigation District. Analysis and calculations were based off of those seepage measurements. Additionally, calculations and analysis were performed to compare construction costs and the Cost/Benefit ratio for installing linings with similar performance.
Catalog Record Title
Data and Report from S&T Project 21076: Concrete Cloth for Seepage Reduction - Field Demonstration
Generation Effort
S&T Project 21076: Concrete Cloth for Seepage Reduction - Field Demonstration
Location Name
Sunnyside Canal near W King Tull Rd, Washington
Type
Uploaded file(s)
File Type
XLSX
Publisher
Bureau of Reclamation
Publication Date
Wednesday, October 1st, 2025
Update Frequency
not planned
Last Update
Monday, October 27th, 2025
Disclaimer
The data from this project are part of a pilot study and experimental, these products are not operational data utilized by the Bureau of Reclamation.