Catalog Item

New Melones Lake Dam and Powerplant Monthly Lake/Reservoir Storage-taf Time Series Data

Time-series reservoir storage modeled by CalSim II for New Melones Lake, produced as part of the Reinitiation of Consultation on the Coordinated Long-Term Operations (ROC on LTO) of the Central Valley Project (CVP) and the State Water Project (SWP) Final Environmental Impact Statement.
Query Data
Generation Effort Reinitiation of Consultation on Long-Term Operations (ROC on LTO)
Type Time series
Modeled/Observed Item-modeled-value
Start Date Mon Oct 31 1921 01:00:00 GMT-0700 (Mountain Daylight Time)
End Date Tue Sep 30 2003 02:00:00 GMT-0600 (Mountain Daylight Time)
Parameter Name Lake/Reservoir Storage
Parameter Group Lake/Reservoir Storage
Parameter Transformation instant
Time Step monthly
Parameter Unit taf
Item Vertical Datum
Update Frequency not planned
Last Update Sunday, March 7th, 2021

Disclaimer

Data are modeled and are subject to the assumptions used in the modeling and the limitations of the model. Results may not be representative of the full range of future possibilities that could occur with different modeling assumptions. Results are provided as an ensemble and should be treated as such.