Catalog Item
New Melones Lake Dam and Powerplant Monthly Lake/Reservoir Area-acres Time Series Data
Time-series reservoir surface area modeled by CalSim II for New Melones Lake, produced as part of the Reinitiation of Consultation on the Coordinated Long-Term Operations (ROC on LTO) of the Central Valley Project (CVP) and the State Water Project (SWP) Final Environmental Impact Statement.
Catalog Record Title
New Melones Lake Dam and Powerplant Water Operations Modeling Data from Reinitiation of Consultation on Long-Term Operations (ROC on LTO)
Generation Effort
Reinitiation of Consultation on Long-Term Operations (ROC on LTO)
Location Name
New Melones Lake Dam and Powerplant
Type
Time series
Modeled/Observed
Modeled
Start Date
Mon Oct 31 1921 01:00:00 GMT-0700 (Mountain Daylight Time)
End Date
Tue Sep 30 2003 02:00:00 GMT-0600 (Mountain Daylight Time)
Parameter Name
Lake/Reservoir Area
Parameter Group
Lake/Reservoir Area
Parameter Transformation
instant
Time Step
monthly
Parameter Unit
acres
Item Vertical Datum
Update Frequency
not planned
Last Update
Sunday, March 7th, 2021
Disclaimer
Data are modeled and are subject to the assumptions used in the modeling and the limitations of the model. Results may not be representative of the full range of future
possibilities that could occur with different modeling assumptions. Results are provided as an ensemble and should be treated as such.

