Catalog Item

S&T Project 23016 Final Report: Evaluation of Infrastructure Coated with Polysiloxane Coatings

This research evaluated polysiloxane coated infrastructure in water immersion and fluctuating immersion service. The coating with the longest ongoing service was aged nine years, applied in 2015. This report provides field assessments results for six structures: Tennessee Valley Authority Fontana Dam, Denver Water Williams Fork Dam, and Reclamation structures at Delta Mendota Canal Intertie, Tracy Fish Collection Facility, and Antioch Fish Release Facility. Field assessments included visual observations to identify macroscopic damage and field electrochemical testing to examine the coating barrier properties.
Download File Opens in new window
Generation Effort S&T Project 23016: Evaluation of Infrastructure Coated with Polysiloxane Coatings
Type Uploaded file(s)
File Type PDF
Publisher Bureau of Reclamation
Publication Date Monday, August 11th, 2025
Update Frequency not planned
Last Update Monday, September 15th, 2025

Disclaimer

The findings and conclusions of this work are those of the author(s) and do not necessarily represent the views of the Bureau of Reclamation.