Catalog Item

November 2025 Most Probable 24-Month Study

The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor Park, Blue Mesa, Morrow Point, Crystal, Vallecito, Navajo, Powell, Hoover Dam - Lake Mead, Davis Dam - Lake Mohave, and Parker Dam - Lake Havasu. Operations were projected using Reclamation’s 24-Month Study RiverWare model with the Most Probable unregulated inflow projections provided by the National Weather Service’s Colorado Basin River Forecast Center. The Most Probable inflow scenario reflects a median hydrologic condition which statistically would be exceeded 50% of the time. The operations depicted in this report reflects the Annual Operating Plan as approved by the Secretary of the Interior.
Download File Opens in new window
Generation Effort Colorado River Basin 24-Month Study
Type Uploaded file(s)
File Type PDF
Publisher Bureau of Reclamation
Publication Date Friday, November 14th, 2025
Update Frequency not planned
Last Update Tuesday, January 13th, 2026

Disclaimer

The Bureau of Reclamation assumes no responsibility or liability for any errors or omissions in the content of this data. The information contained in this data is provided on an "as is" basis with no guarantees of completeness, accuracy, usefulness or timeliness and without any warranties of any kind whatsoever, express or implied. The Bureau of Reclamation does not warrant that this data and any information or material downloaded from the data, will be uninterrupted, error-free, omission-free or free of virus or other harmful items.