Catalog Item

July 2022 Probable Maximum 24-Month Study

The Probable Maximum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor Park, Blue Mesa, Morrow Point, Crystal, Vallecito, Navajo, Powell, Hoover Dam - Lake Mead, Davis Dam - Lake Mohave, and Parker Dam - Lake Havasu. Operations were projected using Reclamation’s 24-Month Study RiverWare model with the Probable Maximum unregulated inflow projections provided by the National Weather Service’s Colorado Basin River Forecast Center. The Probable Maximum inflow scenario reflects a wet hydrologic condition which statistically would be exceeded only 10% of the time.
Download File Opens in new window
Generation Effort Colorado River Basin 24-Month Study
Type Uploaded file(s)
File Type PDF
Publisher Bureau of Reclamation
Publication Date Friday, July 15th, 2022
Update Frequency not planned
Last Update Thursday, May 29th, 2025

Disclaimer

Data are modeled and are subject to the assumptions used in the modeling and the limitations of the model.