Catalog Item
August 2010 Probable Maximum 24-Month Study
The Probable Maximum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor Park, Blue Mesa, Morrow Point, Crystal, Vallecito, Navajo, Powell, Hoover Dam - Lake Mead, Davis Dam - Lake Mohave, and Parker Dam - Lake Havasu. Operations were projected using Reclamation’s 24-Month Study RiverWare model with the Probable Maximum unregulated inflow projections provided by the National Weather Service’s Colorado Basin River Forecast Center. The Probable Maximum inflow scenario reflects a wet hydrologic condition which statistically would be exceeded only 10% of the time.
Download File
Opens in new window
Catalog Record Title
Colorado River Basin 24-Month Study
Generation Effort
Colorado River Basin 24-Month Study
Location Name
Colorado River Basin
Type
Uploaded file(s)
File Type
PDF
Publisher
Bureau of Reclamation
Publication Date
Sunday, August 15th, 2010
Update Frequency
not planned
Last Update
Friday, April 25th, 2025
Disclaimer
Data are modeled and are subject to the assumptions used in the modeling and the limitations of the model. Results may not be representative of the full range of future
possibilities that could occur with different modeling assumptions. Results are provided as an ensemble and should be treated as such.
More Items From This Item’s Catalog Record
Uploaded file(s)

