February 2010 Most Probable 24-Month Study

The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor Park, Blue Mesa, Morrow Point, Crystal, Vallecito, Navajo, Powell, Hoover Dam - Lake Mead, Davis Dam - Lake Mohave, and Parker Dam - Lake Havasu. Operations were projected using Reclamation’s 24-Month Study RiverWare model with the Most Probable unregulated inflow projections provided by the National Weather Service’s Colorado Basin River Forecast Center. The Most Probable inflow scenario reflects a median hydrologic condition which statistically would be exceeded 50% of the time. The operations depicted in this report reflects the Annual Operating Plan as approved by the Secretary of the Interior.
Download File Opens in new window
Generation Effort Colorado River Basin 24-Month Study
Type Uploaded file(s)
File Type PDF
Publisher Bureau of Reclamation
Publication Date Monday, February 15th, 2010
Update Frequency not planned
Last Update Friday, February 14th, 2025

Disclaimer

Data are modeled and are subject to the assumptions used in the modeling and the limitations of the model.