Catalog Item
March 2018 Most Probable 24-Month Study
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor Park, Blue Mesa, Morrow Point, Crystal, Vallecito, Navajo, Powell, Hoover Dam - Lake Mead, Davis Dam - Lake Mohave, and Parker Dam - Lake Havasu. Operations were projected using Reclamation’s 24-Month Study RiverWare model with the Most Probable unregulated inflow projections provided by the National Weather Service’s Colorado Basin River Forecast Center. The Most Probable inflow scenario reflects a median hydrologic condition which statistically would be exceeded 50% of the time. The operations depicted in this report reflects the Annual Operating Plan as approved by the Secretary of the Interior.
Download File
Opens in new window
Catalog Record Title
Colorado River Basin 24-Month Study
Generation Effort
Colorado River Basin 24-Month Study
Location Name
Colorado River Basin
Type
Uploaded file(s)
File Type
PDF
Publisher
Bureau of Reclamation
Publication Date
Thursday, March 15th, 2018
Update Frequency
not planned
Last Update
Friday, February 14th, 2025
Disclaimer
Data are modeled and are subject to the assumptions used in the modeling and the limitations of the model.
More Items From This Item’s Catalog Record
Uploaded file(s)

